Build Team designs and builds rear, side and wraparound extensions in Hillingdon, from Ruislip and Ickenham to Hayes and Uxbridge. One team handles the design, the planning application or Lawful Development Certificate, and the build, at the same prices across London. Prices start at £75,000 including VAT.
Updated · Prices from our house extensions price table
1,750+
projects across London since 2007
4.4 ★
on Google from 243 reviews
The short answer
Do you need planning permission for a house extension in Hillingdon?
Most single-storey rear extensions on houses are permitted development up to 3 m deep on a terraced or semi-detached house and 4 m on a detached one. Hillingdon differs on deeper extensions: a borough-wide Article 4 direction, in force since 22 September 2014, removes permitted development rights for single-storey rear extensions more than 4 m deep, so the 6 m and 8 m prior approval route is not available and anything deeper needs a planning application. Side returns are usually permitted development except in conservation areas; wraparounds, two-storey extensions, flats and listed buildings need planning permission. If you apply, Hillingdon's policy allows 3.3–3.6 m on a terraced or semi-detached house, depending on plot width, and 4 m on a detached house.
Hillingdon is mostly 1930s semi-detached houses, which suit a rear extension or a side extension up to half the width of the house.
Rear extension
Permitted development up to 3 m (4 m detached)
Extends the back wall into the garden. Up to 6 m (8 m detached) with prior approval from the council; beyond that, or where the council's guide sets a lower depth, a planning application.
Fills the side alley of a terraced or semi-detached house to widen the kitchen. Not permitted development in a conservation area or on a listed building.
We have no finished project to show in Hillingdon yet, so these are our nearest ones in west London, in Ealing and Hounslow. Each project page has the full photo set, the floor area and the planning route.
What Hillingdon Council's guidance says about house extensions
A borough-wide Article 4 direction (in force since 22 September 2014) removes permitted development rights for single-storey rear extensions deeper than 4 m, so these need a planning application.
Single-storey rear extensions: up to 3.3 m deep on terraced or semi-detached houses on plots up to 5 m wide, 3.6 m on wider plots, and 4 m on detached houses.
Flat roofs no higher than 3 m, pitched roofs no higher than 3.4 m.
Side extensions no wider than half the original house; two-storey side extensions set in at least 1 m from the boundary and set back at least 1 m from the front.
Roof extensions on the rear only, no wider than two-thirds of the roof and below the ridge.
30 minutes at home or online. We look at your roof, your street and what you want from the space.
Design & planning
Measured survey, drawings and the planning application or Lawful Development Certificate. Fixed fee from £3,995.
Build
Structural design, building control and party wall notices, then our team builds it.
Handover
Building control sign-off, with a 3-year structural guarantee plus 2 years' defects liability.
How much does a house extension cost in Hillingdon?
Our ground floor prices are the same across London and include VAT, design, fees, party wall and contingency. When you compare quotes, check that each one covers the same things.
Option
From
To
Per m²
Includes
Side return (10–18 m²), all-in
£80,000
£140,000
£6,500–£8,500
Fills the side alleyway; keeps the garden
Rear extension (15–25 m²), all-in
£75,000
£150,000
£4,200–£6,500
Extends the back wall into the garden
Wraparound (20–35 m²), all-in
£130,000
£250,000
£5,500–£7,500
Side and rear together; largest footprint
Shell only (any shape), build cost
£40,000
£160,000
£2,500–£5,000
Structure, roof, glazing, first-fix services; before fees, VAT, kitchen
Build Team London prices, updated May 2026. All prices include VAT unless stated. What each price includes.
How long it takes
Six to eight months from the first design meeting to handover. Design and planning take 12–14 weeks (a Lawful Development Certificate or a full planning application), then Building Regulations drawings, structural calculations and party wall notices. The build takes 12–20 weeks with a named Build Manager on site.
Most single-storey rear extensions on houses are permitted development up to 3 m deep on a terraced or semi-detached house and 4 m on a detached one. Hillingdon differs on deeper extensions: a borough-wide Article 4 direction, in force since 22 September 2014, removes permitted development rights for single-storey rear extensions more than 4 m deep, so the 6 m and 8 m prior approval route is not available and anything deeper needs a planning application. Side returns are usually permitted development except in conservation areas; wraparounds, two-storey extensions, flats and listed buildings need planning permission. A Lawful Development Certificate confirms in writing that your extension is permitted development.
No. Elsewhere in England a terraced or semi-detached house can go to 6 m (8 m detached) through prior approval, but Hillingdon's Article 4 direction removes permitted development rights for single-storey rear extensions over 4 m. A deeper extension needs a householder planning application (£548), and Hillingdon's policy then generally allows 3.3–3.6 m on a terrace or semi and 4 m on a detached house.
With Build Team (May 2026 prices, all-in including VAT): a side return costs £80,000–£140,000, a rear extension £75,000–£150,000 and a wraparound £130,000–£250,000. These prices include design, professional fees, party wall costs, contingency and VAT; many online cost guides quote build cost before VAT, so add 20% to compare like with like. The free design consultation turns this into a figure for your house.
Six to eight months from the first design meeting to handover: 12–14 weeks for design and planning, then 12–20 weeks on site.
The fees are set nationally: from 1 April 2026 a householder planning application in England costs £548, prior approval for a larger rear extension £249 and a Lawful Development Certificate for a proposed extension £274.
Usually, on a terrace or semi. Under the Party Wall etc. Act 1996, notice goes to your neighbours at least one month before digging foundations close to their house, and two months before work on the party wall itself. We prepare the notices as part of the build.
Always, even when no planning application is needed. Building Control checks the structure, foundations, insulation, drainage and fire safety. We prepare the drawings and structural calculations in the design phase.