After the Design Phase

Three ways to build your extension

Every route starts with the same Design Phase: drawings, structural calculations and a schedule of works that you can use with any builder. Then you choose who runs the build.

  1. Option 1

    Tender it yourself

    You have the time and experience to run the build, and want to shop around for a builder.

    Manages the build
    You
    Contract
    Between you and your builder
    Guarantee
    Whatever your builder offers
    What you pay
    Design Phase fee only
    How it works
  2. Option 2

    Build with our help

    You want to run the build yourself, with an experienced eye on the contract, the work and the payments.

    Manages the build
    You, with our oversight
    Contract
    With your builder, drafted with our help
    Guarantee
    Your builder's, with our inspections on record
    What you pay
    Design Phase fee + contract management fee
    How it works
  3. Most clients choose this Option 3

    We build it

    You would rather hand it over and have one company answerable for the whole job.

    Manages the build
    Build Team, with a named Build Manager
    Contract
    One fixed-price contract with Build Team
    Guarantee
    3-year structural + 2 years' defects liability
    What you pay
    Design Phase fee + fixed build price
    How it works

Why most clients let us build it

Design and build under one roof means one company is answerable from the first drawing to the handover.

  • One contract, one price

    The build price is fixed in a single contract with Build Team, so you are not juggling separate trades or quotes.

  • The team that designed it builds it

    Your drawings, structural calculations and schedule of works stay with the same company on site, so nothing is lost in the handover.

  • A named Build Manager

    One person runs your site from start to handover and keeps you updated as the work goes on.

  • Guaranteed for years

    Every build comes with a 3-year structural guarantee and 2 years' defects liability, in your handover folder.

How each route works

Your contract is with us, your Build Manager works for us, and the guarantee is ours. This is what happens from the day you instruct us.

  1. 1

    Site meeting

    You meet your Build Manager at the property to confirm the details.

  2. 2

    Preparation

    Building Control appointed, paperwork arranged, parking bay suspended for the skip.

  3. 3

    Start on site

    Protection down, strip-out, foundations dug.

  4. 4

    Construction

    Twelve to sixteen weeks for a typical extension, with regular updates.

  5. 5

    Services and plastering

    Electrics and plumbing, then plasterboard and plaster.

  6. 6

    Practical completion

    A walk-round with your Build Manager; we finish the snags and clear the site.

  7. 7

    Handover

    Your handover folder, with the documents and the guarantee.

More about the Build Phase →

Common questions

Not sure which one fits?

Talk it through with one of our architects, free. Tell us where you are and we will tell you honestly which route makes sense, including the ones where we don't build it.

Book a free consultation