Press Coverage

The Metro, May 2015
26 May 2015
Our build in Streatham, SW2 has been featured in the property section of the Metro!
The build was completed in 2014 and is based in the Telford Park Conservation Area, which has strict planning regulations.
One of the main features of this project is the seamless transition between the inside and outside spaces. This was acheived with the use of bi-fold doors and carefully chosen Marazzi floor tiles.
Take a look at our gallery for more pictures of the project.
Download the PDF