Press Coverage

Real Homes, March 2015
08 Jan 2015
One of our builds has been featured as a case study in the February 2015 issue of Real Homes Magazine.
Located in Clapham SW4, the project was completed in Summer 2014.
The Fleetwood family contacted Build Team as they were having problems with their existing architect. As the client comments “After we’d contacted Build Team, it was smooth sailing from then on’.
Build Team took over and were successful in gaining planning permission for a 60 square meter wraparound extension facing a highway within the standard planning timeframe.
Download the PDF