Cookies management by TermsFeed Generator

Press Coverage

The Metro, May 2015

The Metro, May 2015

26 May 2015

Our build in Streatham, SW2 has been featured in the property section of the Metro!

The build was completed in 2014 and is based in the Telford Park Conservation Area, which has strict planning regulations. 

One of the main features of this project is the seamless transition between the inside and outside spaces. This was acheived with the use of bi-fold doors and carefully chosen Marazzi floor tiles. 

Take a look at our gallery for more pictures of the project.



Download the PDF
Back to top
}

Thank you for your request.

We will contact you at your preferred time.

Ok